OPTIC FIBRE CABLE PROJECTS

We had a total of 1200 labourers for this region as it was not suitable for machine excavation. The following teams are at the company’s call.

Our Teams

  1. Trenching team
  2. Bridge team
  3. HDPE team
  4. River crossing team
  5. Cable team
  6. Reinstatement team
  7. Transport team

Work Procedures

  • All other necessary local materials for the project such as cement, sand, bricks, steel wire, stone manhole etc are provided.
  • The detailed supply plan for materials shall be submitted to the contractor in time, and all materials specification should.
    be approved by THE CONTRACTOR beforehand.