ENGINEERING, EVALUATION, TESTING & ACCEPTANCE

Project Management

  1. Plan of Engineering Evaluation, Testing and Acceptance.
  2. Controlling Measures for Construction Implementation Plan.
  3. Crisis Management.
  4. Control Measures for Construction Procedure and Quality Assurance.
  5. Assurance Solution for safety, health and environment safety.
  6. Health.
  7. Environment.

Base Station Construction

We have a team of five (5) ready at our disposal to be deployed at the sites within a period of 3 days. This team consists of the following members:

  1. Structural Engineer.
  2. Civil Engineer.
  3. Electrician.
  4. RF/Microwave Engineer.